Mapei's Mapecem® Quickpatch can be primed and covered with a leveler, a cement-based overlay or a tile-setting mortar in as little as 90 minutes, depending on temperatures. Moisture-controlling adhesives or moisture mitigation systems can be used over Mapecem Quickpatch in as little as 16 hours, and floor coverings can be installed in as little as 16 hours after application (as long as the existing subfloor meets the requirements of the mortars or adhesives used for installation).
- Dries grey to blend with existing concrete
- Ease of placement
- Can be primed and covered with a leveler, a cement-based overlay or a tile-setting mortar in as little as 90 minutes, depending on temperatures
- Moisture-controlling adhesives or moisture mitigation systems can be used over Mapecem Quickpatch in as little as 16 hours
- Floor coverings can be installed in as little as 16 hours after application, as long as the existing subfloor meets the requirements of the mortars or adhesives used for installation